Connecting procedure
|
For connecting Arm and Coresight Galvanic Isolation Adapters, refer to Connecting procedure. |
|
Do not use a Grounding wire between the BlueBox and the embedded target since it would counteract the primary functionality of the Galvanic Isolation (GI) Adapter! |
1. Make sure your hardware is powered OFF.
•Embedded Target
•BlueBox
•GI Adapter
2. Connect a Debug Adapter to the BlueBox. Refer to the BlueBox User Manual for more details on connecting the Debug Adapter.
3. Connect the Debug Adapter to the GI Adapter.
4. Connect 1:1 Ribbon cable which is delivered along this package to the GI Adapter.
5. Connect 1:1 Ribbon cable to the embedded target.
6. Connect BlueBox, GI Adapter and Target to the power supply.
|
Use only original USB PD Power supply for powering and connecting with the GI Adapter, otherwise the primary functionality of the GI Adapter would be counteracted. |
7. Power ON the hardware in the following order:
•BlueBox
•GI Adapter
•Target
|
If LEDs on the GI Adapter are OFF, immediately turn everything OFF! |