Please enable JavaScript to view this site.

HQ Pack Assembly

First check that the pin 1 positions on the pad pattern and all of the components are correctly aligned.

 

1. Solder the NQPACK on the Target after checking for a match with the position of pin 1 on the Target.

2. Install the Microcontroller after checking for a match with the position of pin 1 on the NQPACK.

3. Mount the HQPACK Socket Cover after checking for a match with the position of pin 1 on the Microcontroller.

 

Click to enlarge

Copyright © 2024 TASKING