Connect the BlueBox and the Target via Active Probe Debug
In this topic:
The Active Probe Debug is connected to the Target via:
•One ribbon cable adapter
•iC7 Active Probe Adapter
and the other side to the iC7max/iC5700 FNet port via the FNet cable.
Connect the Active Probe's FNet cable to the BlueBox FNet port. |
Connect the ribbon cable adapter to the iC7 Active Probe Adapter. |
Connect the Active Probe Adapter to the Target. |
The white dot indicates pin one. Connectors also have a key and socket. Insert (and remove) the black connector parallel to the surface of the Target.
Power on the BlueBox. |
Power on the Target. |
When debugging is completed the hardware should be powered off in the reverse order.
By following these two simple steps, you can successfully verify communication with the BlueBox and eliminate the possibility of communication issues.
Go to Hardware | Debugger Hardware | Communication. |
Press Test. |
If the Communication Test Status displays Hardware not found , follow the Communication issues category in Knowledge Base.
•Create your first winIDEA IDE Workspace
•How to Connect BlueBox Hardware - Video Tutorial
•Active Probe Debug - Hardware User Manual